• Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
  • Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
  • Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
  • Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
  • Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
  • Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve

Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve

Warranty: One Year
Product Type: PP PE PVC PPR Pipe
Screw No.: Single and Double Screw
Automation: Automatic
Computerized: Computerized
Customized: Customized
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Our Advantages
  • Product process
  • FAQ
Overview

Basic Info.

Model NO.
200mm
Condition
New
After-sales Service
After Good Service
Product Material
Steel
Heating Plates
Cast-Aluminium Heating Plates
Die Head
40cr/3cr17, 304SUS
Calibrator
3cr17monov
Surface Treatment
Mirror Polish
Extrusion Speed
10m/Min
Mould Cavity
1*2
Application
HDPE, PVC, PP, PE Pipe
Tooling Machine
CNC-Plastic Mould
Runner
Hot Runner\ Cold Runner
Material
40cr or Steel
Function
Shaping Pipes
Diameter
20-630mm and Customized
Material Calibration Unit
Copper or Stainless Steel
Transport Package
Wooden Cases
Specification
63mm
Trademark
Hannshine
Origin
Shanghai Hannshine
HS Code
84779000
Production Capacity
50000PCS/Month

Product Description

Product Description

Plastic Pipe Extrusion mold is a kind of molding mold, but his way of discharging is to achieve through the action of extrusion.It is widely used in aluminum shaped structure and also in plastic parts.In the front end of the extruder, used for making pipe, or profile. In short, the mold is used to shape the tool, this tool is composed of various parts, different mold is composed of different parts, it mainly through the formation of material physical state change to achieve the shape of the object processing.
The mould is the main processing tool for manufacturing parts in industrial departments such as machinery manufacturing, radio instrument, motor and electric appliance.The quality of die directly affects the quality of pressure processing technology, the precision output of products and production cost. Besides rational structure design and machining accuracy, the quality and service life of molds are mainly affected by mold materials and heat treatment.

Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
 
Product Parameters
 
Pipe size range
PE/PPR
Calibrator type
Speed
Max output
16-32mm 
PE/PPR
16/20 butterfly calibrator
5-15m/min
70-100kg/h
20-32mm *2 high
PPR
20/25/32butterfly cali.
2.5-20m/min
200-300kg/h
20-63mm
PE/PPR
Standard calibrator
1-15m/min
80-180kg/h
20-63mm high 
PE/PPR
20/25/32butterfly cali.
1.2-20m/min
100-200kg/h
20-110mm high
PE/PPR
20/25/32butterfly cali.
1.2-20m/min
220/360kg/h
75-160mm
PE/PPR
Standard calibrator
0.4-7m/min
360/520kg/h
90-200mm
PE
Standard calibrator
0.5-5m/min
360/520kg/h
110-250mm
PE
Standard calibrator
0.45-45m/min
520/720kg/h
200-400mm
PE
Standard calibrator
0.2-2m/min
520/720kg/h
250-500mm
PE
Standard calibrator
0.18-1.8m/min
720/1000kg/h
315-630mm
PE
Standard calibrator
0.15-1.5m/min
1000/1400kg/h
400-800mm
PE
Standard calibrator
0.09-0.9m/min
1000/1400kg/h
710-1200mm
PE
Standard calibrator
0.05-0.5m/min
1400/1600kg/h
Detailed Photos
Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
Our Advantages

1. Regardless of material viscosity variation ,widely applicable for HDPE/MDPE,PERT,PP/PPR,PPR-FIBER,PB,PS/ABS and HMW-PE pipe production with reliable processing property .
2. High output but rather low pressure drop and melt temperature 
3. Capacious and smooth runner reduces the pipe stress to the minimum
4.High quality cermic heater with long service life
5.Pipe with scratch-free smooth surface finishing

6. Die head raw material with special surface treament.
7. Different die head design especially for its inner stucture to make sure pipe extrusion sucessfully.
8. Heating system to keep the pipe extrusion at proplery temperature during extrusion.
9. Choose properly material for Calibrating sleeve to make its longer service life and better pipe surface.

Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
High output but rather low pressure drop and melt temperature 
. Capacious and smooth runner reduces the pipe stress to the minimum
Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
High quality cermic heater with long service life
Pipe with scratch-free smooth surface finishing
Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve
Product process

Production process of our Plastic extrusion mould extrusion die head,
1. Quality Control for income Raw material.
2. Material Heat treatment.
3. Raw material will do Wire-electrode cutting, CNC machining,drilling,etc.
4.Finished components will do pre-assembly, after that, polishing components to make sure all components match together perfect and with smooth surface. Lastly, extrusion die head will do Chrome-plating process.
5. Plastic Extrusoin mould extrusion die head will do assembly again.
6. Ready Package and delivery.
Die Mandrel Sizing Sleeve Die Month for PPR PE PP PVC Pipe Sizing Sleeve

FAQ

What's The Main Business In Your Company? The main products are PE/PPR/PVC pipe production lines,WPC/PVC profile produciton lines,PET bottles and PP/PE films recycling line,Plastic wastes pelletizing lines, and all kinds of otherauxiliary equipments,such as Mixer,Crusher,Pulverizer,Shredder,Water Chiller and so on.

Can you tell me your payment way and delivery and guarantee time?
1. Delivery Time: 30 working days after receiving your down payment.
2. Payment Condition: 30% by T/T for deposit and 70% by T/T before delivery time.
3.Guarantee: 12 months for the machine (the electric parts for 6 months).

 How about your arrangement for inspection,installation and testing work?
1. After all machines are delivered to customer's factory;
2.We will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
3.The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance for each engineer.
4.Engineer will give free training lessons to labors in buyer's factory.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now