500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold

Product Details
Customization: Available
Warranty: One Year
Product Type: PVC and PE Pipe
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
73901.09 USD
Plant Area
260 square meters
  • 500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
  • 500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
  • 500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
  • 500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
  • 500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
  • 500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Sample Display
  • Our Advantages
  • Product process
  • FAQ
Overview

Basic Info.

Model NO.
500mm
Screw No.
Single-screw
Automation
Automatic
Computerized
Computerized
Customized
Customized
Condition
New
After-sales Service
After Good Service
Product Material
Steel
Heating Plates
Cast-Aluminium Heating Plates
Shaping Mode
40cr/3cr17, 304SUS
Calibrator
Forming Mould
Main Unit
Extruder
Extrusion Speed
10m/Min
Usage
Water Pipe
Application
HDPE, PVC
Tooling Machine
CNC-Plastic Mould
Runner
Hot Runner\ Cold Runner
Material
40cr or Steel
Function
Shaping Pipes
Diameter
20-630mm and Customized
Scrrew Design
Double Wall Screw
Product Material for
Aluminium
Transport Package
Wooden Cases
Specification
160mm
Trademark
Hannshine
Origin
Shanghai Hannshine
HS Code
84779000
Production Capacity
50000PCS/Month

Product Description

 
Product Description

It mainly forms a wave shape inside the extruded material and plays a cooling and shaping role.
We can customize the formed aluminum mold according to customer requirements, and the pipe material (ring stiffness, ring flexibility, weight) can be customized according to market requirements
.

As commonly used pipe, double wall corrugated pipe is important tool to dredge and drain.As the forming mould when producing the double wall corrugated pipe, it has a little difference with the common pipe mould. The double wall corrugated pipe mould is consist of former model, later mold, insert items, row bit, slant, thimble, flow gate and so on.The shape and thickness of mould can infulence the final products.

500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
Product Parameters
 
Model
Type
cooling method
Module width
Number of modules
110-250mm
Horizontal type;Standard speed
Air cooling
132mm
48 pairs/set
200-500mm
157mm
40 pairs/set
200-500mm
Horizontal type;High speed
Water cooling
175.5mm
36 pairs/set
200-800mm
175.5mm
36 pairs/set
100-300mm
175.5mm
36 pairs/set
200-800mm
Vertical type;Standard speed
Air cooling
203.2mm
32 pairs/set
Detailed Photos
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold

 

Sample Display

 

500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
 
Our Advantages

1. Regardless of material viscosity variation ,widely applicable for HDPE/MDPE,PERT,PP/PPR,PPR-FIBER,PB,PS/ABS and HMW-PE pipe production with reliable processing property .
2. High output but rather low pressure drop and melt temperature 
3. Capacious and smooth runner reduces the pipe stress to the minimum
4.High quality cermic heater with long service life
5.Pipe with scratch-free smooth surface finishing

6. Die head raw material with special surface treament.
7. Different die head design especially for its inner stucture to make sure pipe extrusion sucessfully.
8. Heating system to keep the pipe extrusion at proplery temperature during extrusion.
9. Choose properly material for Calibrating sleeve to make its longer service life and better pipe surface.

500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
High output but rather low pressure drop and melt temperature 
. Capacious and smooth runner reduces the pipe stress to the minimum
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
High quality cermic heater with long service life
Pipe with scratch-free smooth surface finishing
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold
Product process

Production process of our Plastic extrusion mould extrusion die head,
1. Quality Control for income Raw material.
2. Material Heat treatment.
3. Raw material will do Wire-electrode cutting, CNC machining,drilling,etc.
4.Finished components will do pre-assembly, after that, polishing components to make sure all components match together perfect and with smooth surface. Lastly, extrusion die head will do Chrome-plating process.
5. Plastic Extrusoin mould extrusion die head will do assembly again.
6. Ready Package and delivery.
500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold

FAQ

What's The Main Business In Your Company? The main products are PE/PPR/PVC pipe production lines,WPC/PVC profile produciton lines,PET bottles and PP/PE films recycling line,Plastic wastes pelletizing lines, and all kinds of otherauxiliary equipments,such as Mixer,Crusher,Pulverizer,Shredder,Water Chiller and so on.

Can you tell me your payment way and delivery and guarantee time?
1. Delivery Time: 30 working days after receiving your down payment.
2. Payment Condition: 30% by T/T for deposit and 70% by T/T before delivery time.
3.Guarantee: 12 months for the machine (the electric parts for 6 months).

 How about your arrangement for inspection,installation and testing work?
1. After all machines are delivered to customer's factory;
2.We will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
3.The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance for each engineer.
4.Engineer will give free training lessons to labors in buyer's factory.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier